(P6) One Year access to Videos related the actual G99/2 Projects using Digsilent Power Factory.


Description

G99/2 Project Studies – Introduction

G99/2 compliance studies are a key requirement for connecting generation and inverter-based resources to the electricity network in the UK. Using DIgSILENT PowerFactory, engineers can model and assess real-world G99/2 projects to ensure that proposed connections meet technical and regulatory standards.


The following videos provide practical examples of G99/2 project workflows, including network modelling, fault level assessment, voltage performance, and protection considerations. These studies support successful grid connection applications and ensure safe, compliant integration of new generation assets.


And don't forget you are only ever one phone call or email away from gaining help while you are within this course.

Help phone number: 07743 029266

Help email address is help@Save-Electricity.co.uk


Content
  • Part 1 Actual Project development Understanding the Capability Envelope
  • Part Two "A Deep Dive"
  • Building the Generator Capability Curve in DIgSILENT”
Completion rules
  • All units must be completed
  • Leads to a certificate with a duration: Forever