(C) How to operate a Deep Sea P100 (16C)


Description
The DSEP100 G99/G59 Mains(utility) Protection Relay detects changes in the mains (utility) supply to which the distributed energy resource (DER) is connected.

If a mains (utility) failure is detected, the DSEP100 will disconnect the equipment in line with national and international DNO requirements. This removes the risk of an islanded grid being formed and protects DER equipment.

DSEP100 is suitable for use with all DER equipment supplying power in parallel with the mains (utility) supply. This includes diesel generators and renewable energies such as photovoltaic (solar) and wind turbine installations etc.

The DSEP100-02 G99 type tested variant is supplied with pre-configured settings to comply with G99 that cannot be changed by the user.



CONNECTING TO THE MAINS (UTILITY)

From 27th April 2019 new Grid Codes replaced G59 in GB. From that date all new distributed energy resources (DERs), formally falling under G59 must comply with new regulation G99.

The DSEP100 Mains Decoupling Relay is compatible with G99.

NB. Existing DERs in GB (connected prior to 27th April 2019) need to be aware that G59 has also been amended. This means that connected equipment, which complied to G59 on installation, may no longer comply.

If you have an existing DSEP100 no new equipment is necessary. Simply change the settings through DSE Configuration Suite PC software.
Content
  • Using CTs with Deep Sea P100
  • Deep Sea P100 PC_Configuration_Interfacing.pdf
  • How to use kW_and_VAr, with Deep Sea P100
  • Deep Sea P100 Module_PIN_codes.pdf
  • Deep Sea P100 Earth_Loop_and_Isolation.pdf
  • Deep Sea DSE-Configuration-Suite-Software-Installation-Manual.pdf
  • Deep Sea DSEP100-Data-Sheet.pdf
  • Deep Sea DSEP100-Installation-Instructions.pdf
  • Deep Sea DSEP100-Operators-Manual _1_.pdf
  • Deep Sea DSEP100-PC-Software-Manual.pdf
  • DSE-Configuration-Suite-Software-Installation-Manual _1_.pdf
  • DSEP100-Data-Sheet _1_.pdf
  • DSEP100-Installation-Instructions _1_.pdf
  • DSEP100-Operators-Manual _2_.pdf
Completion rules
  • All units must be completed