Engineer Recommendations Area

Understanding the Application Process. (25)


Description
We have been asked so many times to show clients how to fill in and understand what the DNO's are looking for when we fill in a G99 application form.

There are many real applications and plans from real projects, and all this information can be shown as its all in the Public Domain, or has been approved to be used by the owner of the intellectual property concerned.

But always have it in your mind as you work through this information, that all DNOs and the Engineers within those DNOs are independent, and they have different ways of reading the Engineering Recommendations.

The information given in this training section will give you a much better understanding of what they are looking for in the many questions they ask within the G99 application forms, we will also show you a real application form which has been filled in and has achieved a connection offer.

Without this information it is very unlikely that you would ever achieve a successful application.

Types of Power Generating Module are defined in Engineering Recommendation G99 and are shown below:

Type A: A Power Generating Module with a Connection Point below 110 kV and a Registered Capacity (ie rating) of 0.8 kW or greater but less than 1 MW.

Type B: A Power Generating Module with a Connection Point below 110 kV and Registered Capacity of 1 MW or greater but less than 10 MW.

Type C: A Power Generating Module with a Connection Point below 110 kV and a Registered Capacity of 10 MW or greater but less than 50 MW.

Type D: A Power Generating Module with a Connection Point at, or greater than, 110 kV; or with a Connection Point below 110 kV and with Registered Capacity of 50 MW or greater.
Content
  • Start by reading this READ ME, It will give you a good understanding.
  • A Read Me Its all About Applications
  • Loads of helpful information in this section, we have tried to show helpful info
  • Types of Power Generating Module
  • Basic Requirements for first contacts with DNOs..docx
  • How to fill in DNO Forms
  • Latest G99 Test Sheet.docx
  • ENA Guidance
  • Useful British Standards
  • Type Testing Information 1
  • Type Testing Information 2
  • Type A ENA Engineering Recommendation G99
  • Form A2-2: Compliance Verification Report
  • Description Of Fault Level
  • Understanding Fault Level
  • Types of Applications form and the rules that go with them.
  • G99 Types B-D Full guide August 2018 complete
  • Latest G99/1-9 Engineering Recommendations.
  • NI Connection-to-the-Distribution-System.pdf
  • Callieburn Court G99.pdf
  • G99_Application Form.pdf
  • Blank G99 ENA App Form (v9).pdf
  • G99 Quick Application for G33 6QB.docx
  • G99 Filled in Application Form 1.pdf
  • G99 Type A Full guide August 2018 complete
  • Distribution Code NIE Issue 4 11-May-2018
  • Deans Electrical Application.pdf
  • Montgomery court G99.pdf
  • New G99_Application Form Mrs Lisa Clark.pdf
  • G99 Application Form for Blue Electric.pdf
  • Type A Application Form.
  • Layham Farm, G99 Application.pdf
  • G99 Application for 21 Mardale.docx
  • G100-1-2 Latest
  • Drawings Sent to DNO Engineering Department, these have been used.
  • Drawing of PV System Layout (1)
  • G99 Electrical SLD.pdf
  • Electrical DNO SLD.pdf
  • Layout for Panel on Order.pdf
  • SLD for Supporting Application .docx
  • SLD for Supporting information for Deans Electrical Connection.docx
  • SLD for Supporting Montgomery Court Application.docx
  • SLD for Supporting Application Layham Farm.docx
  • SLD for Supporting Callieburn Court Application.docx
  • SLD for Supporting Application for Lisa Clark (Kilbride).docx
  • Site Layout Drawings sent to DNO Engineering Departments.
  • Site layout Drawing (1)
  • Drawing Showing Incoming Supply Point.pdf
  • Montgomery PA3 4AH Easy PV Project Report (1).pdf
  • Montgomery Court Site Map G99.pdf
  • Site Plan.pdf
  • Map of 21 Mardale.pdf
  • Great Layout PV Project Report (1).pdf
  • Detailed drawing of Panel Layout.pdf
  • Callieburn site map.pdf
  • Please Read Me Text sent to DNO Engineers, these are good for passing over info.
  • Please Read Me Message (1)
  • Please Read Me Message (2)
  • Please Read Me Message (3)
  • Please Read Me Message (4)
  • Please Read Me Message (5)
  • Please Read Me Message (6)
  • Please Read Me Message (7)
  • Please Read Me Message (8)
  • Information on Modelling for C and D Applications, large scale power stations.
  • Information On Modelling used in C and D Applications (1)
  • Information On Modelling used in C and D Applications (2)
  • Real Letters of Authority, you have to get these right or they will come back.
  • Real Used Letters of Authority. (3)
  • Real Used Letters of Authority. (2)
  • Real Used Letters of Authority. (1)
  • Real Used Letters of Authority. (4)
  • Real Used Letters of Authority. (5)
  • Real Used Letters of Authority. (6)
  • Real Used Letters of Authority. (7)
  • Real Used Letters of Authority. (8)
  • Real Used Letters of Authority. (9)
  • This Information is relevant to short term connections.
  • G99 Form B2-2 issue 1 amd 4 - LV Short Term Parallel Ammended V3.docx
  • G99 Short term Parallel details AMD 9.pdf
Completion rules
  • All units must be completed